Up to ₹1,08,000
Subsidy for a UP home
₹78,000 central under PM Surya Ghar plus ₹30,000 state top-up. Our in-house desk files it.
Waaree · TOPCon · Tubular 24 V · hybrid
12 nos Waaree 545 Wp TOPCon (current batch). Tubular battery bank (24 V, 150–200 Ah tubular). Single-kit and bulk rates are different.
Installation, civil work and net metering are part of the kit price. Only the subsidy release sits with the government portal.
Single-kit and bulk rates are quoted. Ask from the form below.
Structure, cable, ACDB/DCDB, LA, earthing, accessories and civil work are the same for every brand at 6 kW. Only panels, inverter and battery change with the set you pick.
| Item — kya milta hai | Company | Watt / size | Quantity |
|---|---|---|---|
| This brand — panels, inverter, battery | |||
| TOPCon solar panels | Waaree | 545 Wp TOPCon (current batch) | 12 nos |
| Hybrid inverter | Waaree / UTL hybrid | 6 kW hybrid inverter, 24 V | 1 nos |
| Tubular battery bank | UTL / as quoted | 24 V, 150–200 Ah tubular | 2 nos |
| Structure, civil work and accessories — same for this kW | |||
| Battery cable | ISI copper | 25 sq mm | As per battery placement |
| DC solar cable (panel to inverter) | ISI solar DC cable | 6 sq mm, UV resistant | 50 metres included in kit |
| AC cable (inverter to meter / DB) | ISI copper | 10 sq mm | 20 metres included in kit |
| Earthing cable | ISI copper | 8 sq mm | 15 metres included in kit |
| Module mounting structure | GI / aluminium MMS | Roof structure for 12 panels | 1 set |
| DCDB | Branded AC/DC protection | 3-in 1-out DCDB with SPD | 1 nos |
| ACDB | Branded AC/DC protection | 6 kW ACDB with MCB and SPD | 1 nos |
| Lightning arrestor | Standard LA | Roof-mounted lightning protection | 1 nos |
| Earthing kit | Chemical / GI earthing | AC, DC and LA earthing | 3 sets |
| MC4 connectors | Compatible MC4 | Panel string connectors | 12 pairs |
| Fasteners and accessories | Kit pack | Clamps, nuts, conduits as per structure | 1 set |
| Civil work | Vira Solar | Structure foundation, grouting, earthing pits and inverter/battery platform | Included with this kit |
Up to ₹1,08,000
Subsidy for a UP home
₹78,000 central under PM Surya Ghar plus ₹30,000 state top-up. Our in-house desk files it.
In the price
Installation, civil work and net metering are part of the kit price. Only the subsidy release sits with the government portal. Installation is done by one of our 20+ in-house teams, and customer care after handover is ours too.
Finance
Up to 100% of the system can be financed. Government banks start around 5.5% a year and private banks and NBFCs around 7%.
Rates shown are the starting slabs published by the lenders and can change. Sanction, the rate you actually get, the funded share and the tenure are decided by the bank on your income and CIBIL, not by Vira Solar.
Quote
The table on this page lists every supply item: panels (make, watt, quantity), inverter, DC/AC/earth cable size and included length, structure, DCDB, ACDB, lightning arrestor, earthing, connectors and civil work.
Yes. Panels, inverter and battery change by brand and set (TOPCon or bifacial; hybrid also tubular or lithium at 24 V or 48 V). Structure, cable, ACDB/DCDB, LA, earthing, accessories and civil work stay the same for this kW.
No. One kit is billed at the single-kit rate. Five or more kits are billed at the bulk rate, ₹5,000 less per kit.
A homeowner can buy one kit. A solar agency or any other buyer can order one kit or bulk. For a homeowner the price also covers installation, civil work and the net-metering process, and our in-house desk files the PM Surya Ghar and UPNEDA papers.
The metres shown are the standard kit pack. Extra DC, AC or earth cable is measured on site or from your layout and added to the quote.
Yes. Installation by one of our own teams, civil work and the net-metering process are inside the kit price for a homeowner. Only the subsidy release sits with the government portal. A UP home can claim up to ₹78,000 central and ₹30,000 state, so up to ₹1,08,000, subject to approval.
Yes. Government banks run rooftop solar loans from around 5.5% a year, private banks and NBFCs from around 7%, and up to 100% of the system can be funded. We help with the file, but sanction, the rate and the tenure are decided by the bank.