Residential net metering in Uttar Pradesh
The DISCOM approves the meter. We prepare the home-system file after installation.
After the panels, not before
The net meter file is useful once there is an inspectable residential system. We do not treat a phone enquiry as a completed metering case.
Our own desk files it
Vira Solar runs an in-house net metering desk instead of sending you to an agent. Filing, follow-up with the division and the meter installation are part of the kit price, not a separate charge.
Purvanchal DISCOM context
Much of Eastern UP is served by PuVVNL for domestic connections. Checklists and inspection slots vary by division. Lucknow homes follow the local Lucknow process.
Your name stays on the application
The consumer is the applicant. Vira Solar helps assemble papers and coordinate. We cannot sign the utility’s approval.
Questions
How many days does it take in UP?
There is no single statewide number we will invent. After the survey we give a range based on that division’s current practice.